Case studies
Logistics & Warehousing · Japan
Maintenance of the WMS / OMS / Inspection App System Cluster
NTQ maintains and extends Commerce Robotics' (CMR Labo) WMS/XP, OMS and inspection app cluster in a multi-vendor environment; rewriting the slip printing function cut processing time by ~85%, meeting the client's target.
PythonFastAPIJavaScriptNext.jsMySQLMongoDBDockerAWSGitCursor
Project overview
- Client: Commerce Robotics (CMR Labo)
- Country: Japan
- Industry: Logistics – warehouse and order management
- Scale: 120.61 MM, 16 months (06/2024 ~ 09/2025), team grew from 2 → 10 people
- Project type: Maintenance Service
- Scope of work: Basic design, Coding, Integration Test
Problem / Challenges
- When taking over the project, NTQ was responsible for only a small part of the CMR system cluster and did not yet understand the overall business flow, the system structure or the components developed by other vendors.
- The system shares source code and APIs with the CMR cluster (partly NTQ, partly other vendors), so every enhancement request needed careful assessment and considerable optimisation effort.
- The order slip printing function was slow; the client wanted to cut processing time by about 80–90%.
Solution
- Internal brainstorming to define the business flow, followed by Q&A and illustrative mockups to reconfirm understanding with the client.
- After updating the business flow, held joint meetings between vendors to ensure the business logic was correct and did not affect other vendors' components.
- Performance improvement: rewrote the entire printing function, reduced the number of database queries and optimised SQL statements.
Key features
WMS / XP
- Inventory, inbound and outbound management
- Order sorting batches
- Printing warehouse operation slips: invoices, waybills, combined slips, picking lists…
OMS
- Product and order management
- Creating inbound instructions
- Robot-based standardisation of product and order data
Inspection app
- Inspection for regular orders
- Inspection for batch 1-1 orders
Technology
- Languages: Python, JavaScript
- Framework/Platform: FastAPI, Next.js
- Database: MySQL, MongoDB
- Tools: Cursor, Git, Docker, AWS
- Integration: OMS (Order Management System), PMS (Print Management System)
Results
- Clarified and standardised the overall business flow, giving NTQ and the other vendors a shared understanding of the system and reducing miscommunication.
- Cross-vendor discussions detected and prevented potential logic conflicts early.
- Order slip printing time was cut by about 85%, meeting the client's target; database load fell thanks to fewer queries and optimised SQL; performance remains stable even at high volumes.
- The client reported smoother operations and faster order processing.
Lessons learned
- When taking over a multi-vendor system, build an end-to-end system map and business flow from the outset.
- Clear mechanisms are needed for sharing documentation and API specifications and for managing source control between vendors.
- Before optimising performance, benchmark and analyse the root cause to avoid optimising in the wrong direction.
- When refactoring code or queries, run regression tests to ensure other parts are not affected.
- Communicate proactively and regularly with the client to confirm the real need (reducing user waiting time or reducing server CPU load).